WF-12 · Ammonia & Fertilizer Chain

Ammonia & Fertilizer Chain

Propagates gas cost through the NH₃→urea chain while separating the physical calculation, nowcast and falsifiable M+1 forecast.

Experimental · calculation + forecastMon–Fri 09:50 Europe/Rome; monthly maturationChemistry · fertilizers · commodities
Demonstration card: workflow summary, not evidence from a real plant.
1 · In one sentence

Propagates gas cost through the NH₃→urea chain while separating the physical calculation, nowcast and falsifiable M+1 forecast.

2 · Why it exists

Make gas-cost transmission into ammonia and urea visible while separating theoretical European cost, global market benchmarks and future forecasts.

3 · What it produces

Implied NH₃/urea cost, model-market spread, interval forecast and matured track record.

The images come from demonstration runs included in the attached repository and are shown without dates to illustrate workflow structure, method and evidence.

Workflow overview and primary output.
Calculation method and pipeline.
Evidence, metrics or checks from the demonstration run.
History, sensitivities or validation context.

4 · How it works

From data to output, with explicit controls.

1TTF, fertilizer benchmarks and FX
2NH₃ physical balance
3NH₃→urea propagation
4Model-market spread
5Ridge/GB M+1 forecast
6Maturation and track record

Transferable pattern: Physical cost chain + econometric transmission + maturation.

5 · Data, AI/ML/RPA and method

Data and features

TTF, World Bank Pink Sheet, ECB FX, lags/seasonality; explicit HHV/LHV

Calculation / inference

deterministic NH₃/urea chain + Ridge/Gradient Boosting M+1 forecast

Stack

Python, pandas, scikit-learn, SQLite, Matplotlib

6 · Technical dossier

Operating conditions and declared limitations.

Compute cadenceMon–Fri 09:50 Europe/Rome; monthly maturation
Planned publicationIT Wed 11:30; EN Wed 20:30
Possible applicationsfertilizers, feedstocks, cost pressure and procurement intelligence
Research uselags, elasticity and ML-vs-physical-model comparison
Required conditionglobal benchmark kept distinct from modelled European cost
Failure modemistaking a global benchmark for European cost or mixing nowcast and forecast
Interpretation boundary

The global benchmark is not a European spot price, and implied cost does not include every plant, logistics, contract or margin-specific factor.

7 · Verification and further reading

Read the workflow in the wider laboratory context.